Tired of waiting?
With GroundPlug® Screw Piles, your building project will be completed fast and easily

Fast completion

Screwpiling will save you significant construction time.
  • Screw piles take a fraction of the time to install compared to concrete.
  • No waiting for the concrete to dry.
  • GroundPlug® Screw Piles are approved via documentation and don't require extra site inspections.
Step 1
Build and level your foundation frame
Step 2
Install and mount your GroundPlug® Screw Piles
Step 3
Your foundation is ready
Previous slide
Next slide

Reliable building process

Our innovative screw piles can be installed in all kinds of weather, terrain and soil.
  • GroundPlug® Screw Piles can also be installed in frost or rain.
  • Easy installation in difficult accessible areas.
  • Only minimal disturbance in your garden.

Fast completion

Screwpiling will save you significant construction time.
  • Screw piles take a fraction of the time to install compared to concrete.
  • No waiting for the concrete to dry.
  • GroundPlug® Screw Piles are approved via documentation and don’t require extra site inspections
Step 1
Build and level your foundation frame
Step 2
Install and mount your GroundPlug® Screw Piles
Step 3
Your foundation is ready
Previous slide
Next slide

Reliable building process

Our innovative screw piles can be installed in all kinds of weather, terrain and soil.
  • GroundPlug® Screw Piles can also be installed in frost or rain.
  • Easy installation in difficult accessible areas.
  • Only minimal disturbance in your garden.
House construction in snowy surroundings.

Be inspired by other projects

753,5ft2 + 215,3 ft2
Wooden deck in several levels.
“We chose GroundPlug® Foundations because they are easy to level and it is very windy where we live.”
– Peter, Denmark
Previous slide
Next slide
Previous slide
Next slide
753,5ft2 + 215,3 ft2 wooden deck in several levels.
“We chose GroundPlug® Foundations because they are easy to level and it is very windy where we live.”
– Peter, Denmark

GroundPlug® Screw Piles come in many sizes to suit your specific project

Get a Quote

Send us your project and get your quote within 48 hours.

Place an Order

Visit our webshop for ordering.

Find out more

Send a message, we are ready to help.

Get a Quote

Send us your project and get your quote within 48 hours.

Place an Order

Visit our webshop for ordering.

Find out more

Send a message, we are ready to help.

Select one or more options

If you do not know your soil conditions, remove the top 12 inches of the soil layer and take a sod of the soil you find below.

(If nothing is indicated, we calculate for stiff clay by default)

Attach file
Attach file
Attach file

Select one or more options

If you do not know your soil conditions, remove the top 12 inches of the soil layer and take a sod of the soil you find below.

(If nothing is indicated, we calculate for stiff clay by default)

Attach file
Attach file
Attach file

Select one or more options

If you do not know your soil conditions, remove the top 12 inches of the soil layer and take a sod of the soil you find below.

(If nothing is indicated, we calculate for stiff clay by default)

Attach file
Attach file
Attach file
X