Build smarter
Easy and smart foundation with GroundPlug® Screw Piles

Avoid heavy work

GroundPlug® Screw Piles are designed for extra easy installation.
  • Screwpiling doesn´t require digging or pouring.
  • No heaving heavy concrete from the hardware store.
  • Hit some rocks? Just screw up the pile, move it slightly and screw it in again in a spot with less obstacles.

Smart & easy foundation

With GroundPlug® Screw Piles, you will finish your building project faster.
  • Fast installation - only a few minutes per foundation.
  • Smaller foundations are easily installed with a handheld impact wrench.
  • GroundPlug® Screw Piles don´t require drying time – work can continue immediately.

Avoid heavy work

GroundPlug® Screw Piles are designed for extra easy installation.
  • Screwpiling doesn’t require digging or pouring.
  • No heaving heavy concrete from the hardware store.
  • Hit some rocks? Just screw up the pile, move it slightly and screw it in again in a spot with less obstacles.

Smart & easy foundation

With GroundPlug® Screw Piles, you will finish your building project faster.
  • Fast installation – only a few minutes per foundation.
  • Smaller foundations are easily installed with a handheld impact wrench.
  • GroundPlug® Screw Piles don’t require drying time – work can continue immediately.
Mounting of a GroundPlug® L-bracket.

Be inspired by other projects

753,5ft2 + 215,3 ft2
Wooden deck in several levels.
“We chose GroundPlug® Foundations because they are easy to level and it is very windy where we live.”
– Peter, Denmark
Previous slide
Next slide
Previous slide
Next slide
753,5ft2 + 215,3 ft2 wooden deck in several levels.
“We chose GroundPlug® Foundations because they are easy to level and it is very windy where we live.”
– Peter, Denmark

Get a Quote

Send us your project and get your quote within 48 hours.

Place an Order

Visit our webshop for ordering.

Find out more

Send a message, we are ready to help.

Select one or more options

If you do not know your soil conditions, remove the top 12 inches of the soil layer and take a sod of the soil you find below.

(If nothing is indicated, we calculate for stiff clay by default)

Attach file
Attach file
Attach file

Select one or more options

If you do not know your soil conditions, remove the top 12 inches of the soil layer and take a sod of the soil you find below.

(If nothing is indicated, we calculate for stiff clay by default)

Attach file
Attach file
Attach file

Select one or more options

If you do not know your soil conditions, remove the top 12 inches of the soil layer and take a sod of the soil you find below.

(If nothing is indicated, we calculate for stiff clay by default)

Attach file
Attach file
Attach file

GroundPlug® Screw Piles come in many sizes to suit your specific project

X